Thursday, October 4, 2012
Thursday, May 31, 2012
Tuesday, March 13, 2012
Friday, August 5, 2011
SOUTHBOUND STATE ROUTE 99 AT KANSAS AVENUE IN MODESTO
LONG TERM CLOSURE
Stanislaus County - The California Department of Transportation (Caltrans) will close the southbound off and on-ramps from Kansas Avenue to State Route 99 (SR-99).
The ramps will close on Monday, August 8, 2011, at 7:00 a.m. and are scheduled to re-open by Wednesday, August 31, 2011.
This closure is necessary to ensure the safety of workers and motorists while the ramps are reconstructed.
The detour for this closure is:
• Southbound SR-99 to Maze Boulevard off ramp
• Left onto L Street/SR-132
• Left onto northbound SR-99
• Northbound SR-99 to Kansas off ramp
Crews will also close the #3 (right) lane southbound SR-99 beginning on Tuesday, August 9, 2011, through Thursday, August 11, 2011, from 9:00 p.m. until 5:00 a.m. and the #3 (right) lane northbound SR-99 beginning on Wednesday, August 10, 2011, through Friday, August 12, 2011 from 9:00 p.m. until 5:00a.m.
Motorists should expect 15 minute delays. Alternate routes should be taken whenever possible.
This work is scheduled to begin as listed, but is subject to change based on weather conditions.
#
For the safety of workers and other motorists, please Slow For the Cone Zone.
##
http://www.dot.ca.gov/
###
Stanislaus County - The California Department of Transportation (Caltrans) will close the southbound off and on-ramps from Kansas Avenue to State Route 99 (SR-99).
The ramps will close on Monday, August 8, 2011, at 7:00 a.m. and are scheduled to re-open by Wednesday, August 31, 2011.
This closure is necessary to ensure the safety of workers and motorists while the ramps are reconstructed.
The detour for this closure is:
• Southbound SR-99 to Maze Boulevard off ramp
• Left onto L Street/SR-132
• Left onto northbound SR-99
• Northbound SR-99 to Kansas off ramp
Crews will also close the #3 (right) lane southbound SR-99 beginning on Tuesday, August 9, 2011, through Thursday, August 11, 2011, from 9:00 p.m. until 5:00 a.m. and the #3 (right) lane northbound SR-99 beginning on Wednesday, August 10, 2011, through Friday, August 12, 2011 from 9:00 p.m. until 5:00a.m.
Motorists should expect 15 minute delays. Alternate routes should be taken whenever possible.
This work is scheduled to begin as listed, but is subject to change based on weather conditions.
#
For the safety of workers and other motorists, please Slow For the Cone Zone.
##
http://www.dot.ca.gov/
###
Labels:
99,
Caltrans,
commuter,
Construction,
highway,
Modesto,
Move Over,
Road work,
roadwork,
Slow Down,
slow for the cone zone,
Stanislaus
STATE ROUTE 88 AT CARSON PASS IN ALPINE COUNTY
Alpine County - The California Department of Transportation (Caltrans) will work to repair the mountain slope at the Carson Pass, east of Kirkwood, near Red Lake Road. This project is necessary in order to improve safety at this location by decreasing the rockfall activity and resulting debris from entering the roadway.
One-way traffic control is currently in effect at the Carson Pass from just west of the National Forest Boundary to just east of the vista point and will remain for the duration of the project.
Continuing on Monday, August 8, 2011, crews will close the highway daily, Monday through Friday, from 10:00 a.m. until 1:00 p.m. Blasting and slope removal activities will occur daily during closures. The full closure is necessary to ensure the safety of both workers and motorists. This work is currently scheduled to be completed by the end of September.
Motorists should expect 15 minute delays during the one-way traffic control and at least two hour delays during the full closures. Alternate routes should be taken whenever possible.
This work is scheduled to begin as listed, but is subject to change based on weather conditions.
#
For the safety of workers and other motorists, please Slow For the Cone Zone.
##
http://www.dot.ca.gov/
###
One-way traffic control is currently in effect at the Carson Pass from just west of the National Forest Boundary to just east of the vista point and will remain for the duration of the project.
Continuing on Monday, August 8, 2011, crews will close the highway daily, Monday through Friday, from 10:00 a.m. until 1:00 p.m. Blasting and slope removal activities will occur daily during closures. The full closure is necessary to ensure the safety of both workers and motorists. This work is currently scheduled to be completed by the end of September.
Motorists should expect 15 minute delays during the one-way traffic control and at least two hour delays during the full closures. Alternate routes should be taken whenever possible.
This work is scheduled to begin as listed, but is subject to change based on weather conditions.
#
For the safety of workers and other motorists, please Slow For the Cone Zone.
##
http://www.dot.ca.gov/
###
Labels:
Alpine,
Amador,
Caltrans,
Carson Pass,
commuter,
Construction,
highway,
Kirkwood,
Move Over,
Road work,
roadwork,
Sierra Passes,
Slow Down,
slow for the cone zone
San Joaquin County Roadwork 8/7/2011 - 8/13/2011
*STATE ROUTE 4 (SR-4) (CROSSTOWN FREEWAY) AT INTERSTATE 5 (I-5) IN STOCKTON
The California Department of Transportation (Caltrans) will perform maintenance on the bridges on SR-4 (Crosstown Freeway) at I-5.
Work will occur on Sunday, August 7, 2011, from 1:00 a.m. until 11:00 a.m. Work will occur at the following locations:
• The connector ramps from eastbound and westbound SR-4 to northbound I-5 will close;
• The on-ramp from Center Street to eastbound SR-4 will close;
• The #4 (right) and auxiliary lane from the eastbound SR-4/northbound I-5 connector ramp to Pershing Avenue will close; and
• The northbound off-ramp from I-5 to Pershing Avenue will close.
Motorists should expect 10 minute delays. Alternate routes should be taken whenever possible.
------------------------------------------------------------------------------------
*I-5 FROM HAMMER LANE TO THE SAN JOAQUIN/SACRAMENTO COUNTY LINE
Caltrans will replace slabs on I-5 from Hammer Lane to San Joaquin/Sacramento County line. No two consecutive on or off-ramps will be closed at the same time. Work will occur as follows:
• The #2 (middle) and # 3 (right) lanes on northbound I-5 from Eight Mile Road to SR-12 will close beginning Sunday, August 7, 2011, through Friday, August 12, 2011, from 7:00 p.m. until 6:00 a.m.;
• The #1 (left) and #2 (middle) lanes on southbound I-5 from SR-12 to Hammer Lane will close beginning Sunday, August 7, 2011, through Friday, August 12, 2011, from 7:00 p.m. until 6:00 a.m.;
• The connector ramps from northbound I-5 at SR-12 will close beginning Sunday, August 7, 2011, through Friday, August 12, 2011, from 9:00 p.m. until 5:00 a.m.;
• The #2 (right) lane on northbound I-5 from SR-12 to the San Joaquin/Sacramento County line will close beginning Sunday, August 7, 2011, through Friday, August 12, 2011, from 8:00 p.m. until 5:00 a.m.;
• The northbound on-ramps from Hammer Lane, Turner Road and Peltier Road will alternately close beginning Sunday, August 7, 2011, through Friday, August 12, 2011, from 9:00 p.m. until 5:00 a.m.;
• The northbound off-ramps to Turner Road, Peltier Road and Walnut Grove Road will alternately close beginning Sunday, August 7, 2011, through Friday, August 12, 2011, from 9:00 p.m. until 5:00 a.m.;
• The #1 (left) lane on southbound I-5 from SR-12 to Eight Mile Road will close beginning Monday, August 8, 2011, through Friday, August 12, 2011, from 6:00 a.m. until 4:00 p.m.;
• The #3 (right) lane on northbound I-5 from Eight Mile Road to SR-12 will close beginning Monday, August 8, 2011, through Friday, August 12, 2011, from 6:00 a.m. until 3:00 p.m.;
Motorists should expect 20 minute delays. Alternate routes should be taken whenever possible.
-----------------------------------------------------------------------------------
*SR-99 FROM SR-26/FREMONT STREET TO WOODBRIDGE ROAD
Caltrans will treat the bridge decks on SR-99 from SR-26/Fremont Street to Woodbridge Road. No two consecutive on or off-ramps will be closed at the same time. Work will occur as follows:
• The northbound off-ramp and the southbound on-ramp at SR-26/Fremont Street will close beginning Monday, August 8, 2011, through Friday, August 12, 2011, from 8:00 p.m. until 6:00 a.m.;
• The #1 (left) lane on eastbound and westbound SR-26/Fremont Street at SR-99 beginning Monday, August 8, 2011, through Friday, August 12, 2011, from 8:00 p.m. until 6:00 a.m.;
• The southbound off-ramp at Turner Road and the southbound on-ramp from Woodbridge Road will close beginning Monday August 8, 2011, through Friday, August 12, 2011, from 8:00 p.m. until 6:00 a.m.; and
• The #1 (left) and #2 (middle) lanes on southbound SR-99 at the Mokelumne River will close beginning Monday August 8, 2011, through Friday, August 12, 2011, from 7:00 p.m. until 6:00 a.m.
Motorists should expect 10 minute delays. Alternate routes should be taken whenever possible.
---------------------------------------------------------------------------------------
*SR-120 FROM I-5 TO SR-99 IN MANTECA
Caltrans will work on the roadway on SR-120 from I-5 to SR-99. No two consecutive on or off-ramps will be closed at the same time. Work will occur as follows:
• The left shoulder, #1 (left) and #2 (right) lanes and right shoulder and the on and off-ramps on westbound SR-120 from I-5 to SR-99 will alternately close beginning Sunday, August 7, 2011, through Friday, August 12, 2011, from 7:00 p.m. until 4:00 a.m.;
• The #1 (left) lane on the connector ramp from westbound SR-120 to southbound I-5 will close beginning Sunday, August 7, 2011, through Friday, August 12, 2011, from 7:00 p.m. until 4:00 a.m.;
• The connector ramp from westbound SR-120 to northbound I-5 will close on Sunday, August 7, 2011, from 5:00 a.m. until 1:00 p.m.; and
• The left shoulder, #1 (left) and #2 (right) lanes and right shoulder and the on and off-ramps on eastbound SR-120 from I-5 to SR-99 will alternately close beginning Sunday, August 7, 2011, through Friday, August 12, 2011, from 10:00 p.m. until 7:00 a.m.
Motorists should expect 20 minute delays. Alternate routes should be taken whenever possible.
--------------------------------------------------------------------------------
*I-205 FROM 11TH STREET TO JUST WEST OF THE TOM PAINE SLOUGH
Caltrans will construct auxiliary lanes and install a changeable message sign on I-205. Work will occur as follows:
• The #2 (middle) and #3 (right) lanes on westbound I-205 from 11th Street to MacArthur Drive will close beginning Monday, August 8, 2011, through Friday, August 12, 2011, from 7:00 p.m. until 6:00 a.m.;
• The westbound off-ramp to MacArthur Drive will close beginning Monday, August 8, 2011, at 7:00 p.m. until Tuesday, August 9, 2011, at 4:00 a.m.;
• The #2 (middle) and #3 (right) lanes on eastbound I-205 from Tracy Road to MacArthur Drive will close beginning Monday, August 8, 2011, through Friday, August 12, 2011, from 9:00 p.m. until 9:00 a.m.;
• The #3 (right) lane and right shoulder on eastbound I-205 just west of Tom Paine Slough will close beginning Monday, August 8, 2011, at 9:00 p.m. until Tuesday, August 9, 2011, at 1:00 p.m.; and
• The #3 (right) lane and right shoulder on westbound I-205 just east of MacArthur Drive will close beginning Monday, August 8, 2011, at 8:00 p.m. until Tuesday, August 9, 2011, at 4:00 a.m.
Motorists should expect 15 minute delays. Alternate routes should be taken whenever possible.
----------------------------------------------------------------------------------------
*SR-99 FROM SR-219 IN STANISLAUS COUNTY TO MILGEO AVENUE IN SAN JOAQUIN COUNTY
Caltrans will construct a median barrier and pave on SR-99 from SR-219 to Milgeo Avenue. Work will occur as follows:
• The median, left shoulder, #1 (left) and #2 (middle) lanes on southbound SR-99 from Milgeo Avenue to Hammett Road will close beginning Sunday, August 8, 2011, through Friday, August 12, 2011, from 7:00 p.m. until 7:00 a.m.;
• The median, left shoulder, #1 (left) and # 2 (middle) lanes on northbound SR-99 from SR-219 to Milgeo Avenue will close beginning Sunday, August 8, 2011, through Friday, August 12, 2011, from 7:00 p.m. until 6:00 a.m.
Motorists should expect 25 minute delays. Alternate routes should be taken whenever possible.
The California Department of Transportation (Caltrans) will perform maintenance on the bridges on SR-4 (Crosstown Freeway) at I-5.
Work will occur on Sunday, August 7, 2011, from 1:00 a.m. until 11:00 a.m. Work will occur at the following locations:
• The connector ramps from eastbound and westbound SR-4 to northbound I-5 will close;
• The on-ramp from Center Street to eastbound SR-4 will close;
• The #4 (right) and auxiliary lane from the eastbound SR-4/northbound I-5 connector ramp to Pershing Avenue will close; and
• The northbound off-ramp from I-5 to Pershing Avenue will close.
Motorists should expect 10 minute delays. Alternate routes should be taken whenever possible.
------------------------------------------------------------------------------------
*I-5 FROM HAMMER LANE TO THE SAN JOAQUIN/SACRAMENTO COUNTY LINE
Caltrans will replace slabs on I-5 from Hammer Lane to San Joaquin/Sacramento County line. No two consecutive on or off-ramps will be closed at the same time. Work will occur as follows:
• The #2 (middle) and # 3 (right) lanes on northbound I-5 from Eight Mile Road to SR-12 will close beginning Sunday, August 7, 2011, through Friday, August 12, 2011, from 7:00 p.m. until 6:00 a.m.;
• The #1 (left) and #2 (middle) lanes on southbound I-5 from SR-12 to Hammer Lane will close beginning Sunday, August 7, 2011, through Friday, August 12, 2011, from 7:00 p.m. until 6:00 a.m.;
• The connector ramps from northbound I-5 at SR-12 will close beginning Sunday, August 7, 2011, through Friday, August 12, 2011, from 9:00 p.m. until 5:00 a.m.;
• The #2 (right) lane on northbound I-5 from SR-12 to the San Joaquin/Sacramento County line will close beginning Sunday, August 7, 2011, through Friday, August 12, 2011, from 8:00 p.m. until 5:00 a.m.;
• The northbound on-ramps from Hammer Lane, Turner Road and Peltier Road will alternately close beginning Sunday, August 7, 2011, through Friday, August 12, 2011, from 9:00 p.m. until 5:00 a.m.;
• The northbound off-ramps to Turner Road, Peltier Road and Walnut Grove Road will alternately close beginning Sunday, August 7, 2011, through Friday, August 12, 2011, from 9:00 p.m. until 5:00 a.m.;
• The #1 (left) lane on southbound I-5 from SR-12 to Eight Mile Road will close beginning Monday, August 8, 2011, through Friday, August 12, 2011, from 6:00 a.m. until 4:00 p.m.;
• The #3 (right) lane on northbound I-5 from Eight Mile Road to SR-12 will close beginning Monday, August 8, 2011, through Friday, August 12, 2011, from 6:00 a.m. until 3:00 p.m.;
Motorists should expect 20 minute delays. Alternate routes should be taken whenever possible.
-----------------------------------------------------------------------------------
*SR-99 FROM SR-26/FREMONT STREET TO WOODBRIDGE ROAD
Caltrans will treat the bridge decks on SR-99 from SR-26/Fremont Street to Woodbridge Road. No two consecutive on or off-ramps will be closed at the same time. Work will occur as follows:
• The northbound off-ramp and the southbound on-ramp at SR-26/Fremont Street will close beginning Monday, August 8, 2011, through Friday, August 12, 2011, from 8:00 p.m. until 6:00 a.m.;
• The #1 (left) lane on eastbound and westbound SR-26/Fremont Street at SR-99 beginning Monday, August 8, 2011, through Friday, August 12, 2011, from 8:00 p.m. until 6:00 a.m.;
• The southbound off-ramp at Turner Road and the southbound on-ramp from Woodbridge Road will close beginning Monday August 8, 2011, through Friday, August 12, 2011, from 8:00 p.m. until 6:00 a.m.; and
• The #1 (left) and #2 (middle) lanes on southbound SR-99 at the Mokelumne River will close beginning Monday August 8, 2011, through Friday, August 12, 2011, from 7:00 p.m. until 6:00 a.m.
Motorists should expect 10 minute delays. Alternate routes should be taken whenever possible.
---------------------------------------------------------------------------------------
*SR-120 FROM I-5 TO SR-99 IN MANTECA
Caltrans will work on the roadway on SR-120 from I-5 to SR-99. No two consecutive on or off-ramps will be closed at the same time. Work will occur as follows:
• The left shoulder, #1 (left) and #2 (right) lanes and right shoulder and the on and off-ramps on westbound SR-120 from I-5 to SR-99 will alternately close beginning Sunday, August 7, 2011, through Friday, August 12, 2011, from 7:00 p.m. until 4:00 a.m.;
• The #1 (left) lane on the connector ramp from westbound SR-120 to southbound I-5 will close beginning Sunday, August 7, 2011, through Friday, August 12, 2011, from 7:00 p.m. until 4:00 a.m.;
• The connector ramp from westbound SR-120 to northbound I-5 will close on Sunday, August 7, 2011, from 5:00 a.m. until 1:00 p.m.; and
• The left shoulder, #1 (left) and #2 (right) lanes and right shoulder and the on and off-ramps on eastbound SR-120 from I-5 to SR-99 will alternately close beginning Sunday, August 7, 2011, through Friday, August 12, 2011, from 10:00 p.m. until 7:00 a.m.
Motorists should expect 20 minute delays. Alternate routes should be taken whenever possible.
--------------------------------------------------------------------------------
*I-205 FROM 11TH STREET TO JUST WEST OF THE TOM PAINE SLOUGH
Caltrans will construct auxiliary lanes and install a changeable message sign on I-205. Work will occur as follows:
• The #2 (middle) and #3 (right) lanes on westbound I-205 from 11th Street to MacArthur Drive will close beginning Monday, August 8, 2011, through Friday, August 12, 2011, from 7:00 p.m. until 6:00 a.m.;
• The westbound off-ramp to MacArthur Drive will close beginning Monday, August 8, 2011, at 7:00 p.m. until Tuesday, August 9, 2011, at 4:00 a.m.;
• The #2 (middle) and #3 (right) lanes on eastbound I-205 from Tracy Road to MacArthur Drive will close beginning Monday, August 8, 2011, through Friday, August 12, 2011, from 9:00 p.m. until 9:00 a.m.;
• The #3 (right) lane and right shoulder on eastbound I-205 just west of Tom Paine Slough will close beginning Monday, August 8, 2011, at 9:00 p.m. until Tuesday, August 9, 2011, at 1:00 p.m.; and
• The #3 (right) lane and right shoulder on westbound I-205 just east of MacArthur Drive will close beginning Monday, August 8, 2011, at 8:00 p.m. until Tuesday, August 9, 2011, at 4:00 a.m.
Motorists should expect 15 minute delays. Alternate routes should be taken whenever possible.
----------------------------------------------------------------------------------------
*SR-99 FROM SR-219 IN STANISLAUS COUNTY TO MILGEO AVENUE IN SAN JOAQUIN COUNTY
Caltrans will construct a median barrier and pave on SR-99 from SR-219 to Milgeo Avenue. Work will occur as follows:
• The median, left shoulder, #1 (left) and #2 (middle) lanes on southbound SR-99 from Milgeo Avenue to Hammett Road will close beginning Sunday, August 8, 2011, through Friday, August 12, 2011, from 7:00 p.m. until 7:00 a.m.;
• The median, left shoulder, #1 (left) and # 2 (middle) lanes on northbound SR-99 from SR-219 to Milgeo Avenue will close beginning Sunday, August 8, 2011, through Friday, August 12, 2011, from 7:00 p.m. until 6:00 a.m.
Motorists should expect 25 minute delays. Alternate routes should be taken whenever possible.
Labels:
99,
Caltrans,
commuter,
Construction,
highway,
Highway 12,
I-205,
I-5,
Interstate 5,
Move Over,
Road work,
roadwork,
san joaquin,
Slow Down,
slow for the cone zone,
SR-4,
Stockton,
tracy
Subscribe to:
Posts (Atom)