EASTBOUND STATE ROUTE 152 FROM SAN LUIS DRIVE TO VOLTA ROAD IN MERCED COUNTY

Merced County - The California Department of Transportation (Caltrans) will close the #1 (left) and #2 (right) lanes, alternately, on eastbound State Route 152 from San Luis Drive to Volta Road.

Work will begin on Monday, July 26, 2010, through Friday, July 30, 2010, from 4:00 a.m. until 2:00 p.m.

Crews will pave the roadway in this location.

Motorists should expect 15 minute delays. Alternate routes should be taken whenever possible.

This work is scheduled to begin as listed, but is subject to change based on weather conditions.

The contractor for the $945,000 project is Tom Mayo Construction Inc. of Stockton, CA.

#

For the safety of workers and other motorists, please Slow For the Cone Zone.

##

http://www.dot.ca.gov/

###

STATE ROUTE 132 AT STATE ROUTE 33 IN SAN JOAQUIN COUNTY

San Joaquin County - The California Department of Transportation (Caltrans) will perform one-way traffic control on State Route 132 (SR-132) at the SR-132/SR-33 overhead.

Work will begin on Monday, July 26, 2010, through Friday, July 30, 2010, from 6:00 a.m. until 6:00 p.m.

Motorists should expect 15 minute delays. Alternate routes should be taken whenever possible.

This work is scheduled to begin as listed, but is subject to change based on weather conditions.

The contractor for the $201,600 project is Victory Engineers Inc. of Fresno, CA.

#

For the safety of workers and other motorists, please Slow For the Cone Zone.

##

http://www.dot.ca.gov/

###

STATE ROUTE 124 FROM STATE ROUTE 88 TO WASHINGTON STREET IN AMADOR COUNTY

Amador County - The California Department of Transportation (Caltrans) will perform one-way traffic control on State Route 124 (SR-124) from the SR-88/SR-124 junction to Washington Street.

Work will begin on Monday, July 26, 2010, through Friday, July 30, 2010, from 6:00 a.m. until 6:00 p.m.

Crews will pave the roadway in this location.

Motorists should expect 15 minute delays. Alternate routes should be taken whenever possible.

This work is scheduled to begin as listed, but is subject to change based on weather conditions.

The contractor for the $1.8 million project is George Reed Inc. of Modesto, CA.

#

For the safety of workers and other motorists, please Slow For the Cone Zone.

##

http://www.dot.ca.gov/

###

SOUTHBOUND STATE ROUTE 99 AT GOLDEN STATE BOULEVARD IN MERCED COUNTY

Merced County - The California Department of Transportation (Caltrans) will close the southbound Golden State Boulevard on-ramp on State Route 99.

Work will occur on Thursday, July 29, 2010, from 8:30 a.m. until 2:00 p.m.

Crews will cut and prune the trees in this location.

Motorists should expect 5 minute delays. Alternate routes should be taken whenever possible.

This work is scheduled to begin as listed, but is subject to change based on weather conditions.

#

For the safety of workers and other motorists, please Slow For the Cone Zone.

##

http://www.dot.ca.gov/

###

STATE ROUTE 88 FROM STATE ROUTE 124 TO STATE ROUTE 104 IN AMADOR COUNTY

Amador County - The California Department of Transportation (Caltrans) will perform one-way traffic control on State Route 88 (SR-88) from the SR-88/SR-124 junction in Ione to the SR-88/SR-104 junction in Martell.

Work will begin on Monday, July 26, 2010, through Friday, July 30, 2010, from 6:00 a.m. until 6:00 p.m.

Crews will pave the roadway in this location.

Motorists should expect 15 minute delays. Alternate routes should be taken whenever possible.

This work is scheduled to begin as listed, but is subject to change based on weather conditions.

The contractor for the $1.8 million project is George Reed Inc. of Modesto, CA.

#

For the safety of workers and other motorists, please Slow For the Cone Zone.

##

http://www.dot.ca.gov/

###

Friday, July 9, 2010

FULL HIGHWAY CLOSURE - STATE ROUTE 99 WHITMORE INTERCHANGE PROJECT IN STANISLAUS COUNTY

Stanislaus County - The California Department of Transportation (Caltrans) will close northbound State Route 99 (SR-99) from the Pine Street overcrossing to Hatch Road in Ceres.

Work will begin on Monday, July 12, 2010, through Thursday, July 16, 2010, from 11:00 p.m. until 4:00 a.m.

Crews will work on the falsework for the new interchange.

SR-99 northbound detour is:

• northbound off-ramp to 4th Street;
• Continue north on El Camino Avenue;
• Cross Whitmore Avenue to the new on-ramp to northbound SR-99.

This full highway closure is necessary to ensure the safety of motorists and workers in the area.

Motorists should expect 10 minute delays. Alternate routes should be taken whenever possible. This work is scheduled to begin as listed, but is subject to change based on weather conditions.

The contractor for this $26 million project is Nehemiah Construction of Benicia, CA. The SR-99 Whitmore Avenue Interchange Project will alleviate peak hour congestion along Whitmore Avenue with a new wider overcrossing/overhead and widen Whitmore Avenue to four lanes from Blaker Road and Central Avenue.

#

For the safety of workers and other motorists, please Slow For the Cone Zone.

##

www.dot.ca.gov

###

NORTHBOUND STATE ROUTE 99 AT BUHACH ROAD IN MERCED COUNTY

Merced County - The California Department of Transportation (Caltrans) will close the northbound Buhach Road off-ramp on State Route 99 for bridge work.

Work will begin on Monday, July 12, 2010, through Friday, July 16, 2010, from 7:00 p.m. until 5:00 a.m.

Motorists should expect 10 minute delays. Alternate routes should be taken whenever possible.

This work is scheduled to begin as listed, but is subject to change based on weather conditions.

The contractor for the $646,100 project is Jeffco Painting and Coating Inc. of Vallejo, CA.

#

For the safety of workers and other motorists, please Slow For the Cone Zone.

##

http://www.dot.ca.gov/

###

STATE ROUTE 12 FROM SOUTHWORTH ROAD TO CEDAR STREET IN CALAVERAS COUNTY

Calaveras County - The California Department of Transportation (Caltrans) will perform one-way traffic control on State Route 12 from Southworth Road to Cedar Street.

Work will begin on Monday, July 12, 2010, through Friday, July 16, 2010, from 7:00 a.m. until 5:00 p.m.

Crews will work on the drainage and sewer in this location.

Motorists should expect 15 minute delays. Alternate routes should be taken whenever possible.

This work is scheduled to begin as listed, but is subject to change based on weather conditions.

The contractor for the $5.9 million project is Teichert Construction of Stockton, CA.

#

For the safety of workers and other motorists, please Slow For the Cone Zone.

##

http://www.dot.ca.gov/

###

NORTHBOUND INTERSTATE 5 AT PELTIER ROAD IN SAN JOAQUIN COUNTY

San Joaquin County - The California Department of Transportation (Caltrans) will close the northbound Peltier Road off-ramp on Interstate 5 to place pavement markers and stripe the roadway.

Work will begin on Monday, July 12, 2010, through Tuesday, July 13, 2010, from 9:00 a.m. until 2:30 p.m.

Motorists should expect 5 minute delays. Alternate routes should be taken whenever possible.

This work is scheduled to begin as listed, but is subject to change based on weather conditions.

#

For the safety of workers and other motorists, please Slow For the Cone Zone.

##

http://www.dot.ca.gov/

###

STATE ROUTE 120 BETWEEN INTERSTATE 5 AND STATE ROUTE 99 IN SAN JOAQUIN COUNTY

San Joaquin County - The California Department of Transportation (Caltrans) will work on the roadside signs on State Route 120 (SR-120) between Interstate 5 (I-5) and SR-99. Work will occur as follows:

• The connector ramp from southbound I-5 to eastbound SR-120 will close on Monday, July 12, 2010, from 9:00 a.m. until 1:00 p.m.;

• The #2 (right) lane and right shoulder on westbound SR-120 from McKinley Avenue to the Wyche Overhead will close on Tuesday, July 13, 2010, from 12:00 p.m. (noon) until 2:00 p.m.;

• The #2 (right) lane and right shoulder on westbound SR-120 from Main Street to Union Road will close on Thursday, July 15, 2010, from 9:00 a.m. until 2:00 p.m.;

• The #2 (right) lane and right shoulder on westbound SR-120 from Moffat Boulevard to the Main Street overcrossing will close on Wednesday, July 14, 2010, from 9:00 a.m. until 2:00 p.m.; and

• The connector ramp from southbound SR-99 to westbound SR-120 will close on Tuesday, July 13, 2010, from 9:00 a.m. until 12:00 p.m. (noon).

Motorists should expect 10 minute delays. Alternate routes should be taken whenever possible.

This work is scheduled to begin as listed, but is subject to change based on weather conditions.

#

For the safety of workers and other motorists, please Slow For the Cone Zone.

##

http://www.dot.ca.gov/

###

Friday, July 2, 2010

Improvements to Stockton’s I-5 Corridor Coming

Stockton – The California Department of Transportation (Caltrans) announces improvement plans for Interstate 5 (I-5) in Stockton. Caltrans has developed a series of improvements for I-5 between Charter Way and the Sacramento County line. These projects will improve traffic circulation and regional mobility, reduce congestion, add two new High Occupancy Vehicle (HOV) lanes and increase the pavement life for the corridor.

“Citizens of Stockton and the region can look forward to three major highway projects and several other projects that will enhance the local economy and improve mobility,” said Ross Chittenden, District 10 Director. “The long awaited improvements for the busy I-5 corridor in Stockton are coming,” said Chittenden, “the State will spend $186.3 million in this corridor over the next several years.”

In May, the California Transportation Commission (CTC) approved $42.5 million Corridor Mobility Improvement Account monies to help fund the $119.5 million project that will build the first I-5 carpool lane in San Joaquin County, reconstruct the lanes, widen the median, add auxiliary lanes and ramp metering from Charter Way to Hammer Lane. Additional funding for this project comes from the San Joaquin Council of Governments’ (SJCOG) Measure K and the State Highway Operation and Protection Program (SHOPP). Construction is estimated to begin in April 2011.

A SHOPP savings project received the nod from the CTC in June, moving the project forward towards construction. The $21.4 million pavement enhancing project will replace 3,345 slabs along a 17.2 mile stretch of I-5 from Hammer Lane to the Sacramento County line. Construction is anticipated to begin in April 2011.

A third project, funded by the State’s SHOPP, will reconstruct the existing eight lane freeway and widen the inside shoulders from Charter Way to Country Club Boulevard. The $45.4 million project is scheduled to be in construction April of 2012.

Other projects for the corridor headed for construction are:

• Interchange improvements for Hammer Lane and Eight Mile Road.
• New interchanges at Otto Drive and North Gateway Boulevard.
• Phase II of the HOV lane project from Hammer Lane to North of Eight Mile Road.

In the mean time, Caltrans will continue to maintain the I-5 corridor until the permanent rehabilitation projects are in construction. This summer, Maintenance crews will be replacing pavement slabs as needed and a contract to replace 171 slabs from State Route 4 to March Lane will begin.

#

For the safety of workers and other motorists, please Slow For the Cone Zone.

##

http://www.dot.ca.gov/

###

NORTHBOUND STATE ROUTE 99 AT BUHACH ROAD IN MERCED COUNTY

Merced County - The California Department of Transportation (Caltrans) will close the northbound Buhach Road off-ramp on State Route 99 for bridge work.

Work will begin on Tuesday, July 6, 2010, through Friday, July 9, 2010, from 7:00 p.m. until 5:00 a.m.

Motorists should expect 10 minute delays. Alternate routes should be taken whenever possible.

This work is scheduled to begin as listed, but is subject to change based on weather conditions.

The contractor for the $646,100 project is Jeffco Painting and Coating Inc. of Vallejo, CA.

#

For the safety of workers and other motorists, please Slow For the Cone Zone.

##

http://www.dot.ca.gov/

###

STATE ROUTE 49 FROM FRAGUERO ROAD TO RAWHIDE ROAD IN TUOLUMNE COUNTY

Tuolumne County - The California Department of Transportation (Caltrans) will perform one-way traffic control on State Route 49 from Fraguero Road to Rawhide Road.

Work will begin on Friday, July 2, 2010, through Saturday, July 10, 2010.

Crews will work on the roadway in this location.

Motorists should expect 10 minute delays. Alternate routes should be taken whenever possible.

This work is scheduled to begin as listed, but is subject to change based on weather conditions.

The contractor for the $1.2 million project is Ladd and Associates of Redding, CA.

#

For the safety of workers and other motorists, please Slow For the Cone Zone.

##

http://www.dot.ca.gov/

###

STATE ROUTE 4 FROM THE MIDDLE RIVER BRIDGE TO THE SAN JOAQUIN RIVER BRIDGE IN SAN JOAQUIN COUNTY

San Joaquin County - The California Department of Transportation (Caltrans) will perform one-way traffic control on State Route 4. Work will occur as follows:

• Beginning Thursday, July 8, 2010, at 8:00 p.m. until Friday, July 9, 2010, at 5:00 a.m., crews will treat the bridge deck on the Middle River Bridge and the San Joaquin River Bridge and

• Beginning Tuesday, July 6, 2010, through Thursday, July 8, 2010, from 8:00 p.m. until 5:00 a.m., crews will work on the roadway from the Middle River Bridge to Tracy Boulevard.

Motorists should expect 15 minute delays. Alternate routes should be taken whenever possible.

This work is scheduled to begin as listed, but is subject to change based on weather conditions.

The contractor for the $6,432,000 road construction project is DeSilva Gates Construction of Livermore, CA. The contractor for the $330,000 bridge deck treatment job is Truesdell Corporation of Tempe, AZ.

#

For the safety of workers and other motorists, please Slow For the Cone Zone.

##